Page 192 - Manual Oficina Polaris RZR XP 1000 17-18
P. 192

ENGINE / COOLING SYSTEM

                VALVE COVER INSTALLATION
                1. Apply anti-seize compound to spark plug threads.

                2. Install spark plugs q and torque to specification.
                3. Prepare valve cover sealing surfaces by cleaning
                   thoroughly to remove all residue.
                4. Install valve cover seal w.
                5. Install the four valve cover shoulder bolts e and new
                   isolators r using a T40 driver.




















                6. Torque valve cover bolts to specification.

                                    TORQUE
                                   Spark Plugs:
                                  7 ft-lbs (10 Nm)

                                 Valve Cover Bolts:
                                  7 ft-lbs (10 Nm)







































                3.84                                                   9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual
                                                                                                © Copyright Polaris Industries Inc.
   187   188   189   190   191   192   193   194   195   196   197