Page 105 - Manual Oficina Polaris RS1 2018 e 2019
P. 105
ENGINE / COOLING SYSTEM
8. Install a new thermostat with the bleed hole r
positioned closest to the engine.
3
NOTE
Image shown above is with engine removed for clarity.
9. Reverse this procedure for installation. Torque
thermostat cover bolts to specification.
TORQUE
Thermostat Cover Bolts:
7 ft-lb (10 Nm)
10.Be sure to properly fill and bleed cooling system as
outlined in this chapter.
9928689 - 2018 RZR RS1 Service Manual 3.19
© Copyright Polaris Industries Inc.