Page 105 - Manual Oficina Polaris RS1 2018 e 2019
P. 105

ENGINE / COOLING SYSTEM

                   8. Install a new thermostat with the bleed hole r
                      positioned closest to the engine.











                                                                                                                              3








                                         NOTE
                     Image shown above is with engine removed for clarity.

                   9. Reverse this procedure for installation. Torque
                      thermostat cover bolts to specification.
                                        TORQUE
                                 Thermostat Cover Bolts:
                                      7 ft-lb (10 Nm)

                   10.Be sure to properly fill and bleed cooling system as
                      outlined in this chapter.










































                   9928689 - 2018 RZR RS1 Service Manual                                                              3.19
                   © Copyright Polaris Industries Inc.
   100   101   102   103   104   105   106   107   108   109   110