Page 151 - Manual Oficina Polaris RZR 570 13-18
P. 151
ENGINE / COOLING SYSTEM
6. Carefully install the intake cam at an angle to allow 8. Install the upper cam chain guide and the eight bolts
for cam chain installation. Roll the cam shaft into its that retain the camshaft carrier. Tighten the bolts
bearing pockets and verify that the timing marks are evenly until snug. Do not torque at this time.
in alignment as shown below.
3
9. Install the Cylinder Holding and Camshaft Timing
Plate into the end of camshafts as shown.
NOTE
Cylinder Holding / Camshaft Timing Plate:
Intake cam sprocket should have “I” marks aligned with
gasket surface and the exhaust cam sprocket should PU-50563
have “E” marks aligned with gasket surface.
7. Carefully install the camshaft carrier onto the
camshafts.
9926813 R06 - 2013-2016 RZR 570 Service Manual 3.53
© Copyright Polaris Industries Inc.