Page 151 - Manual Oficina Polaris RZR 570 13-18
P. 151

ENGINE / COOLING SYSTEM


                   6. Carefully install the intake cam at an angle to allow  8. Install the upper cam chain guide and the eight bolts
                       for cam chain installation. Roll the cam shaft into its  that retain the camshaft carrier. Tighten the bolts
                       bearing pockets and verify that the timing marks are  evenly until snug. Do not torque at this time.
                       in alignment as shown below.








                                                                                                                              3










                                                                         9. Install the Cylinder Holding and Camshaft Timing
                                                                             Plate into the end of camshafts as shown.




















                                         NOTE
                                                                                Cylinder Holding / Camshaft Timing Plate:
                    Intake cam sprocket should have “I” marks aligned with
                     gasket surface and the exhaust cam sprocket should                       PU-50563
                         have “E” marks aligned with gasket surface.

                   7. Carefully install the camshaft carrier onto the
                       camshafts.
























                   9926813 R06 - 2013-2016 RZR 570 Service Manual                                                     3.53
                   © Copyright Polaris Industries Inc.
   146   147   148   149   150   151   152   153   154   155   156