Page 152 - Manual Oficina Polaris RZR 570 13-18
P. 152
ENGINE / COOLING SYSTEM
10. Verify cam timing is correct and the piston is a TDC. 14. Torque the camshaft carrier bolts in sequence to
specification.
NOTE
For correct sprocket orientation, insure the “I” for intake
on cam and the “E” for exhaust on cam are positioned
as shown. View from mag side.
TORQUE
Camshaft Carrier Bolts:
7 ft-lbs (10 Nm)
11. If timing marks are not aligned: 15. Insure the new sealing washer u is in place.
• Remove the Camshaft Timing Plate from the end of 16. Install the hydraulic cam chain tensioner i into the
the camshafts. cylinder and torque to specification.
• Remove the cam carrier bolt and cam carrier.
• Correct the camshaft timing as needed.
• Reinstall the cam carrier.
• Re-check cam timing.
12. Remove the Cylinder Holding & Camshaft Timing
Plate from the end of the camshafts.
Cylinder Holding / Camshaft Timing Plate:
PU-50563
13. If needed, install the camshaft carrier and bolts.
TORQUE
Cam Chain Tensioner:
30 ft-lb (40 Nm)
17. Rotate crankshaft through two revolutions and verify
camshaft timing is correct.
3.54 9926813 R06 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.