Page 161 - Manual Oficina Polaris RZR 570 13-18
P. 161
ENGINE / COOLING SYSTEM
TORQUE VALVE CLEARANCE CHECK /
ADJUSTMENT
Cylinder Head Bolts:
Apply light coat of engine oil to bolt threads NOTE
and under bolt head
Always inspect valve clearance prior to camshaft
Torque in Sequence for all steps
installation or final engine assembly.
Step 1: 18 ft-lbs (25 Nm)
Step 2: 30 ft-lbs (40 Nm) 1. Install the cam chain guides and cam chain before
Step 3: Loosen all fasteners until they are camshaft installation (if removed) as outlined in this
unseated chapter. 3
Step 4: 15 ft-lbs (20 Nm) 2. Reference the camshaft intake q and exhaust w
Step 5: 26 ft-lbs (35 Nm) markings made during disassembly. If installing new
camshafts or if camshafts were not marked, you can
Step 6: Additional 180°
reference the part number stamped on the end of the
Step 7: Additional 180° shafts.
Torque The Outer M6 Head Bolts 89 ± 9 in-lbs
(10 ± 1 Nm)
3. Lubricate the camshaft bearing journal surfaces with
Polaris PS-4 engine oil prior to installation.
4. Carefully install the camshafts into the cylinder head.
The camshaft lobes should face out.
5. Carefully install the camshaft carrier onto the
camshafts.
9926813 R06 - 2013-2016 RZR 570 Service Manual 3.63
© Copyright Polaris Industries Inc.