Page 163 - Manual Oficina Polaris RZR 570 13-18
P. 163

ENGINE / COOLING SYSTEM


                   11. Remove the valve tappet q from a valve that was
                       out of specification.











                                                                                                                              3









                                         NOTE
                     Keep mated parts together and in order with respect to
                        their location in the cylinder head for assembly
                     purposes. Mark each component or place them in an
                            organized rack as you remove them.

                   12. Record the 3-digit number engraved on top of the
                       tappet.
                   13. Reference  the  valve  clearance  measurement
                       recorded for that valve, along with the 3-digit tappet
                       number.
                   14. Refer to the appropriate tappet selection matrix
                       (Intake or Exhaust) on the following pages and select
                       the proper tappet.
                   15. Install the new tappet.
                                         NOTE

                      Lubricate the outer portion of the valve bucket upon
                                       installation.

                   16. Repeat steps until all necessary valves have been
                       adjusted.
                   17. Reinstall the camshafts and camshaft carriers and
                       tighten the bolts evenly to specification.
                                       TORQUE
                                  Camshaft Carrier Bolts:
                                     7 ft-lbs (10 Nm)

                   18. Measure and confirm that valve clearance is now
                       within specification for each valve.
                   19. If valve clearance is not within specification, repeat
                       this procedure.
                   20. If all valve clearance measurements are now within
                       specification, remove the camshaft carriers and
                       proceed to “Camshaft Installation / Timing”.



                   9926813 R06 - 2013-2016 RZR 570 Service Manual                                                     3.65
                   © Copyright Polaris Industries Inc.
   158   159   160   161   162   163   164   165   166   167   168