Page 317 - Manual Oficina XP 1000 14-16
P. 317
FINAL DRIVE
11. Leaving the drive shaft in the transmission, swing the 2. Align splines of drive shaft with transmission splines
rear trailing arm assembly outward until it is free from and reinstall the drive shaft. Use a rubber mallet to
the rear drive shaft. tap on the outboard end of the drive shaft if
necessary.
12. Lower the trailing arm.
3. Swing the rear trailing arm assembly outward and
13. With a short, sharp jerk, remove drive shaft from the upward until the rear axle can be inserted into the
transmission splines.
bearing carrier. Support the trailing arm from
underneath.
7
REAR DRIVE SHAFT INSTALLATION 4. Install the lower shock mounting bolt and new nut.
1. Install new spring ring q on drive shaft. Apply an Torque fastener to specification.
anti-seize compound to the splines w.
TORQUE
Lower Shock Bolt to Trailing Arm:
70 ft-lbs (95 Nm)
5. Install the stabilizer bar mounting bolt, washer and
new nut. Torque fastener to specification.
TORQUE
Stabilizer Bar Linkage:
40 ft-lbs (54 Nm)
6. Apply Anti-Seize to drive shaft axle splines.
9926816 R06 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual 7.15
© Copyright Polaris Industries Inc.