Page 166 - Manual Oficina Polaris RS1 2018 e 2019
P. 166
ENGINE / COOLING SYSTEM
10.Carefully place the cylinder and pistons into the upper CRANKSHAFT INSTALLATION
crankcase.
NOTE
Whether installing a new crankshaft or re-installing the
original, refer to the bearing selection charts (see
Crankshaft Main Bearing Selection, and Connecting
Rod Bearing Selection).
1. Rotate the engine so the cylinder is facing down.
2. Clean the bearing bore surfaces of upper crankcase
(main bearings), connecting rods and connecting rod
caps.
3. Align tab of new main bearing q with the slot in main
bearing bore of crankcase. Press bearing insert firmly
into place. Repeat for all main bearings.
4. Align tab of new connecting rod bearings w with the
11. Install the Cylinder Holding & Camshaft Timing Plate slot in the connecting rod stem and connecting rod
end cap. Press bearing insert firmly into place.
w (PU-50563) onto the cylinder. The cylinder holding
tool retains the cylinder and pistons when the engine Repeat for the other connecting rod.
is rotated.
5. Install oil drain diverter e into the upper crankcase.
3.80 9928689 - 2018 RZR RS1 Service Manual
© Copyright Polaris Industries Inc.