Page 133 - Manual Oficina Polaris RZR 570 13-18
P. 133
ENGINE / COOLING SYSTEM
HOLE YEAR VEHICLE DESCRIPTION 10. Torque the two front center isolator bolts to
2017 ACE 900 specification.
5 2015-17 RANGER Diesel
3
i.e. 2015 RZR 900 uses the holes marked with a
4 TORQUE
Isolator Center Bolt:
NOTE
40 ft-lbs (54 Nm)
The Clutch Center Distance Tool is used for the center-
to-center distance only. Make sure that the tool is 11. Remove the lifting straps and overhead or portable
laterally aligned well with the machine and not binding engine hoist and remove the support previously
on the shafts.
installed under the transmission case during the
engine removal process.
8. In sequence, torque the eight engine coupler bracket
fasteners to specification. 12. Reposition the head pipe assembly in the chassis
and install new muffler and head pipe seals. Install
the three head pipe bolts and torque to specification.
TORQUE TORQUE
Rear Engine Coupler Fastener (In Sequence):
Exhaust Head Pipe Bolts:
55 ft-lbs (75 Nm)
18 ft-lb (25 Nm)
9. In a criss-cross pattern, torque the four front engine 13. Install the two springs securing the muffler to the
mount fasteners to specification.
head pipe.
TORQUE 14. Install the three coolant hoses onto the engine.
Front Engine Mount Fasteners:
40 ft-lbs (54 Nm)
9926813 R06 - 2013-2016 RZR 570 Service Manual 3.35
© Copyright Polaris Industries Inc.