Page 130 - Manual Oficina Polaris RZR 570 13-18
P. 130
ENGINE / COOLING SYSTEM
22. Loosen the hose clamp (F) securing the throttle body 25. Remove the three hex bolts (K) securing the exhaust
to the air box. Lift air box up and rearward as an head pipe to the engine. Remove the two springs (L)
assembly to disengage it from the throttle body. securing the muffler to the head pipe. Discard the
muffler and head pipe seals and replace with new for
reassembly.
23. Loosen the hose clamp (G) securing the throttle 26. Remove the head pipe assembly from the right-hand
body to the engine intake boot. Remove throttle body side of the vehicle to gain engine removal clearance.
from the engine and wrap it with a clean shop towel. Removal of the muffler from the chassis is not
Place throttle body on the left-hand side frame rail required.
area.
27. Place a support in-between the main frame and
NOTE transmission case. Do not pinch brake line.
Be sure dirt and debris do not enter the engine, air box
or throttle body. Use clean shop towels to plug engine
and air box intake holes.
24. Disconnect the upper engine coolant hose (H),
bypass hose (I) and ECT (J) harness connector.
28. Use an overhead or portable engine hoist and
suitable engine straps to secure the engine in its
current position.
3.32 9926813 R06 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.