Page 317 - Manual Oficina Polaris RZR 570 13-18
P. 317

TRANSMISSION


                   22. Install the idler gear shaft assembly (A) and gear  24. Assemble shift shaft rail if previously disassembled.
                       cluster assembly (B) into the transmission housing,
                       all at the same time.






















                                                                                               NOTE
                   23. Install the rear output shaft assembly (C). Rotate  Both shift forks need to be orientated the same way, so
                       output shaft assembly to align slots with engagement  that the shift fork pins are both offset to the same side
                       dog. Ensure bearing is fully seated upon assembly.
                                                                                              of the rail.
                                                                         25. Install the shift shaft rail (D) and shift forks into the  6
                                                                             transmission housing as an assembly. Be sure the
                                                                             shift forks are engaged into the engagement dogs.
























                                                                                               NOTE

                                                                           Shift fork pins should be offset towards the input shaft
                                                                                           as shown above.

















                   9926813 R06 - 2013-2016 RZR 570 Service Manual                                                     6.47
                   © Copyright Polaris Industries Inc.
   312   313   314   315   316   317   318   319   320   321   322