Page 296 - Manual_Polaris_RZR_ProXP-20-21
P. 296
PVT SYSTEM
BELT INSTALLATION BELT BREAK-IN
1. With the clutch spreader tool installed, loop the belt A proper break-in of the clutches and drive belt will
over the drive clutch and over part of the driven ensure a longer life and better performance. If a belt fails,
clutch. Be sure to install belt in the direction always clean any debris from the duct and from the
previously marked. engine compartment.
2. Rotate the driven clutch and walk the belt into the Standard Break-In
clutch. Drive at slower speeds for the first 50 miles (80 km) of
operation. Carry only light loads. Avoid aggressive
3. Remove the clutch spreader tool from the driven acceleration, high-speed operation and prolonged
clutch. operation at a specific RPM during this period.
4. Rotate / spin the driven clutch and belt approximately Sand/Dune Break-In
5-7 times to properly seat the belt in the driven clutch. Drive in low gear for the first 5 miles (8 km) of operation.
Avoid prolonged low speed operation at high throttle.
5. Install the outer clutch cover and fourteen fasteners
Avoid aggressive acceleration, high-speed operation and
q. Torque fasteners to specification.
prolonged operation at a specific RPM during this period.
TORQUE
Outer Clutch Cover Fasteners:
36 in-lbs (4 Nm)
6. Install PVT intake hose, and torque hose clamp w to
specification.
TORQUE
PVT Intake Hose Clamp:
25 in-lbs (3 Nm)
6.6 9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
© Copyright Polaris Industries Inc.

