Page 294 - Manual Oficina XP 1000 14-16
P. 294
TRANSMISSION
17.Install the idler gear shaft assembly 2&, gear cluster 20.Install the shift shaft rail 3! and shift forks into the
assembly 2*, and input shaft assembly 2 ( into the transmission housing as an assembly. Be sure the
transmission housing, all at the same time. shift forks are engaged into the engagement dogs.
18.Install the rear output shaft assembly 3). NOTE
Shift fork pins should be offset towards the input shaft
as shown above 3@.
21.Inspect the shift drum for any damage or wear.
Inspect the splines of the shift drum.
19.Assemble the shift shaft rail if previously
disassembled.
NOTE
Both shift forks need to be orientated the same way, so
that the shift fork pins are both offset to the same side
of the rail.
6.26 9926816 R06 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual
© Copyright Polaris Industries Inc.

