Page 295 - Manual Oficina XP 1000 14-16
P. 295
TRANSMISSION
22.Install the shift drum into the transmission housing. 25.Install new seals into the transmission case halves.
Lift up on the shift shaft rail and move the rail • The snorkel shaft seal 3#, should be pressed in until it
assembly towards the shift drum to allow the shift fork seats against the housing counter-bore.
ends to be installed into the shift drum.
23.Apply a continuous bead of Crankcase 3 Bond
Sealant to left-hand transmission mating surface.
• The input shaft seal 3$, should be pressed in until it
seats flush with the housing.
Crankcase 3 Bond Sealant
• The rear output shaft seals 3%, can be installed using a
PN 2871557
standard bushing installation tool. Seals should be
installed just past the case lead-in chamfer (0.070" or 6
24.Install the transmission case cover and retaining 1.8 mm from outer face of bore).
bolts. Torque bolts to specification.
26.Thoroughly clean the shift shaft housing.
27.Install the sector gear (16T) onto the shift drum shaft.
Install the shift shaft assembly and sector gear (11T)
into the bushing pocket on the left side. Align the
timing marks on the gears as shown.
TORQUE 28.Install the spacer and then the detent star onto the
shift drum shaft. Be sure to install the detent star with
Transmission Case Bolts: the raised edge facing outward and skip-tooth
20 ft-lbs (27 Nm) aligned.
9926816 R06 - 2014-2016 RZR XP 1000 / XP4 1000 Service Manual 6.27
© Copyright Polaris Industries Inc.