Page 169 - Manual Oficina Polaris RZR XP 1000 17-18
P. 169
ENGINE / COOLING SYSTEM
UPPER CRANKCASE PREPARATION PISTON RING INSTALLATION
NOTICE NOTICE
Always replace plain bearings when the crankcase or Apply clean engine oil to all ring surfaces and ring lands
connecting rods have been disassembled. Refer to upon installation. Always check piston ring installed gap
bearing selection procedures. before rings are installed on piston (see Piston Ring
Installed Gap (1000)page 3.57). Clean accumulated
1. Remove all traces of crankcase sealer from the carbon from piston ring grooves and oil ring lube holes
crankcase mating surfaces. Inspect the surfaces if piston has been in service.
closely for nicks, burrs or damage.
3
2. Clean bolt hole threads to remove any oil or
crankcase sealant.
3. Inspect crankcase bearing bores. Replace the
crankcase assembly if a bearing bore is galled or if
bearing inserts have rotated in the case.
4. Be sure alignment pins are in place where used.
5. Refer to Engine Oil Flow Chartpage 3.5 at the
beginning of this chapter and trace the oil paths
through the crankcase and cylinder.
6. Flush all oil passages with solvent and then warm
soapy water. Rinse with clear, warm water and dry
with compressed air.
7. Be sure passages are clean and dry before
assembling the upper crankcase. q Top Ring r Spring Expander
w Second Ring t Lower Rail
e Upper Rail
1. Place oil control ring expander in oil ring groove.
Rotate expander in groove until butt ends are on
PTO side of piston (see illustration below).
NOTICE
Ends must butt squarely together and must not overlap.
2. Install lower rail with end gap positioned on the
intake side of piston.
9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual 3.61
© Copyright Polaris Industries Inc.