Page 173 - Manual Oficina Polaris RZR XP 1000 17-18
P. 173

ENGINE / COOLING SYSTEM


                   10. Carefully place the cylinder and pistons into the  CRANKSHAFT INSTALLATION
                       upper crankcase.
                                                                                              NOTICE
                                                                          Whether installing a new crankshaft or re-installing the
                                                                             original, refer to the bearing selection charts (see
                                                                           Chapter 3 – Crankshaft Main Bearing Selectionpage
                                                                          3.60 and Connecting Rod Bearing Selectionpage 3.60
                                                                                                 ).

                                                                         1. Rotate the engine so the cylinder is facing down.
                                                                                                                              3
                                                                         2. Clean the bearing bore surfaces of upper crankcase
                                                                             (main bearings), connecting rods and connecting rod
                                                                             caps.
                                                                         3. Align tab of new main bearing q with the slot in main
                                                                             bearing bore of crankcase. Press bearing insert
                                                                             firmly into place. Repeat for all main bearings.
                   11. Install the Cylinder Holding & Camshaft Timing Plate
                       w (PU-50563) onto the cylinder. The cylinder holding  4. Align tab of new connecting rod bearings w with the
                       tool retains the cylinder and pistons when the engine  slot in the connecting rod stem and connecting rod
                       is rotated.                                           end cap. Press bearing insert firmly into place.
                                                                             Repeat for the other connecting rod.




















                                                                         5. Install oil drain diverter e into the upper crankcase.
































                   9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual                                      3.65
                   © Copyright Polaris Industries Inc.
   168   169   170   171   172   173   174   175   176   177   178