Page 177 - Manual Oficina Polaris RZR XP 1000 17-18
P. 177
ENGINE / COOLING SYSTEM
10. Torque lower crankcase bolts in sequence to 13. Torque the upper crankcase bolts in sequence to
specification. Repeat sequence to verify final torque. specification (start with #12). Repeat the sequence
to verify final torque.
3
TORQUE
TORQUE
Lower Crankcase Bolts:
M10 Bolts: Upper Crankcase Bolts:
Step 1: 9 ft-lb (12 Nm) M8 Bolts: 26 ft-lb (35 Nm)
Step 2: 21 ft-lb (28 Nm)
M6 Bolts: 9 ft-lb (12 Nm)
Step 3: Tighten add’n 90°
14. Rotate the engine so the cylinder is facing down.
M8 Bolts: 15. Install a new seal on the oil pump.
26 ft-lb (35 Nm)
16. Lift the oil pump drive chain and install the oil pump.
M6 Bolts:
9 ft-lb (12 Nm)
11. Rotate the engine so the cylinder is facing up.
12. Install the eleven M6 o and two M8 i upper
crankcase bolts. Tighten all bolts lightly by hand.
9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual 3.69
© Copyright Polaris Industries Inc.