Page 131 - Manual Oficina Polaris RS1 2018 e 2019
P. 131
ENGINE / COOLING SYSTEM
TORQUE ENGINE BREAK-IN PERIOD
Muffler Cover Screws: The break-in period consists of the first 25 hours of
8 ft-lbs (11 Nm) operation, or the time it takes to use 15 gallons (57 liters)
of fuel. Careful treatment of a new engine and drive
components will result in more efficient performance and
38.Install right and left rear fenders.
longer life for these components.
CAUTION
Use only Polaris PS-4 or PS-4 Extreme Duty Synthetic
4-Cycle Engine Oil.Never substitute or mix oil brands.
Serious engine damage and voiding of warranty can 3
result.Do not operate at full throttle or high speeds for
extended periods during the first three hours of use.
Excessive heat can build up and cause damage to
close fitted engine parts.
1. Fill fuel tank with unleaded fuel which has a minimum
pump octane number of 87 = (R + M)/2.
2. Refer to “Engine Oil Level”. Check oil level indicated
on dipstick. Add oil if necessary.
39.Connect battery. Torque fasteners to specification.
3. Drive slowly at first to gradually bring engine up to
TORQUE operating temperature.
Battery Terminal Fasteners: 4. Vary throttle positions. Do not operate at sustained
60 in-lbs (7 Nm) idle or sustained high speed.
5. Perform regular checks on fluid levels, controls and
40.Install front storage box and battery access panel. all important bolt torques.
41.Install lower coolant hose and clamp. Fill coolant 6. Change oil and oil filter after 25 hour break-in period.
reservoir. Bleed system as required. See Cooling
System Bleeding.
9928689 - 2018 RZR RS1 Service Manual 3.45
© Copyright Polaris Industries Inc.