Page 311 - Manual Oficina Polaris RS1 2018 e 2019
P. 311

FINAL DRIVE

                   FRONT BEARING CARRIER INSTALLATION                                        CAUTION

                   1. Install drive shaft axle through the backside of the  New bolts have a pre-applied locking agent which is
                      bearing carrier.                                    destroyed upon removal. Always use new brake caliper
                   2. Install the upper and lower ball joint ends into the          mounting bolts upon assembly.
                      front bearing carrier.
                   3. Install new pinch bolts q and nuts. Torque to      7. Install the steering tie rod end r onto the front
                      specification.                                        bearing carrier.
                                                                                               NOTE
                                                                          Refer to the photo below to ensure proper placement of
                                                                                           the tie rod end.
















                                        TORQUE
                                   Ball Joint Pinch Bolts:
                                     40 ft-lbs (54 Nm)

                   4. Apply Anti-Seize to drive shaft axle splines.      8. Torque the tie rod end fastener t to specification and
                   5. Install front wheel hub assembly w, cone washer e,    install a new cotter pin t.                       7
                      and hand tighten the castle nut. Install washer with
                      domed side out.                                                        TORQUE
                                                                                        Tie Rod End Fastener:
                                                                                        30 ft-lb (41 Nm) + 90°

                                                                         9. Torque wheel hub nut y to specification and install a
                                                                            new cotter pin u. Tighten nut slightly if necessary to
                                                                            align cotter pin holes. Bend both ends of cotter pin
                                                                            around end of spindle in different directions.










                   6. Install new brake caliper mounting bolts and torque to
                      specification.
                                        TORQUE
                                Front Caliper Mounting Bolts:
                                     30 ft-lb (41 Nm)
                                                                                             TORQUE
                                                                                        Wheel Hub Castle Nut:
                                                                                         180 ft-lbs (244 Nm)




                   9928689 - 2018 RZR RS1 Service Manual                                                                7.5
                   © Copyright Polaris Industries Inc.
   306   307   308   309   310   311   312   313   314   315   316