Page 73 - Manual Oficina Polaris RS1 2018 e 2019
P. 73
MAINTENANCE
TRANSMISSION VENT LINE ROUTING
The transmission vent line q runs up the right side of the transmission, and is secured to the electrical harness with a
double-loop cable tie w. Then it is routed and secured along the lower fan shroud e with three hinge clips r. It is then
secured to the rear, left-hand vertical tube r with one hinge clip. The transmission vent line ends its routing on the left-
hand radial tube t with a vent line termination fitting y.
2
9928689 - 2018 RZR RS1 Service Manual 2.51
© Copyright Polaris Industries Inc.