Page 177 - Manual Oficina Polaris RZR 570 13-18
P. 177
ENGINE / COOLING SYSTEM
ENGINE ASSEMBLY - BOTTOM END
CRANKCASE ASSEMBLY – PTO SIDE 5. Install the crankshaft removal / installation tool on to
the PTO side crankcase.
1. Lubricate all crankcase bearings with engine oil.
Clean sealing surface to remove all oil sealant. Crankshaft Removal / Installation Tool
PU-50784
NOTE
Apply Loctite® 641 to the inner race of each of the • Install plate q over adapter w.
crank bearings.
• Evenly attach the assembly q onto the PTO side
crankcase flange using the four bolts provided with
2. Place crankcase on a sturdy work bench. tool. 3
• Place the nut and large washer onto the crankshaft
3. Carefully set the PTO crankcase onto the PTO side
of the crankshaft. installation screwe.
• Insert the crankshaft installation screw through the
4. Align the connecting rod with the cylinder area of the threaded portion of the adaptor w.
crankcase. • Fully thread the crankshaft installation screw into the
clutch bolt threads of the crankshaft.
• With the help of an assistant holding the crankshaft,
firmly hold the crankshaft installation screw with a
wrench while tightening the large nut against the
adaptor w.
6. With the help of an assistant, slowly tighten the nut
until the crankshaft is completely seated into the
crankcase bearings.
7. Remove the crankshaft removal / installation tool
from the crankcase.
9926813 R06 - 2013-2016 RZR 570 Service Manual 3.79
© Copyright Polaris Industries Inc.