Page 179 - Manual_Polaris_RZR_ProXP-20-21
P. 179

ENGINE / COOLING SYSTEM


                   8. If previously removed, install the two fasteners   12.Install both hoses q going to the charge air cooler.
                      retaining the fuel injector wiring bracket to the intake
                      manifold. Torque fasteners to specification.

                                        TORQUE
                           Fuel Injector Wiring Bracket Fasteners:
                                      7 ft-lb (10 Nm)


                   9. Connect the sensors, switches and injectors.
                   10.Connect three hinge clips t to the transmission vent                                                    3
                      line.







                                                                         13.Install the exhaust pipe. See Exhaust Pipe Installation
                                                                            page 3.21.
                                                                         14.Fill the coolant bottle.
                                                                         15.Install the cargo box.
                                                                         16.Run the vehicle for several minutes and check the
                                                                            coolant level. Refill as required.




                   11. Install zip ties retaining the wiring harness around the
                      intake manifold wer.










































                   9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual                                           3.35
                   © Copyright Polaris Industries Inc.
   174   175   176   177   178   179   180   181   182   183   184