Page 181 - Manual_Polaris_RZR_ProXP-20-21
P. 181

ENGINE / COOLING SYSTEM

                   INSTALLATION                                          THERMOSTAT REPLACEMENT

                   1. Install the fan and radiator as an assembly.       1. Remove the cargo box. See Cargo Box Removal
                                                                            page 11.20.
                   2. Connect fan harness.
                                                                         2. Remove the intake manifold. See Charge Air Cooler
                   3. Install two fasteners retaining fan assembly. Torque  Removal page 3.32.
                      fasteners to specification.
                                                                         3. Place a drain pan under the engine below the
                                        TORQUE                              thermostat housing.
                             Fan Assembly Mounting Fasteners:
                                                                         4. Remove the two fasteners t and y retaining the
                                     9 ft-lbs (12 Nm)                       thermostat cover.
                                                                                                                              3
                   4. Connect the two coolant hoses and one vent line
                      going to the radiator.

                   5. Install the charge air radiator into the chassis.
                   6. Install the two large hoses going to the charge air
                      radiator and the small vent hose.
                   7. Install the radiator shroud and install six push pins.
                   8. Install voltage regulator bracket and voltage
                      regulators as an assembly. Install two fasteners and
                      torque to specification.
                                        TORQUE
                            Voltage Regulator Bracket Fasteners:
                                     7 ft-lbs (10 Nm)
                                                                         5. Remove the thermostat cover and hose to access the
                                                                            thermostat u. Pull the thermostat up to remove it
                   9. Connect four voltage regulator harness connectors     from the housing.
                      (two per voltage regulator).
                   10.Install front fascia.
                                        TORQUE
                                  Front Fascia Fasteners:
                                     7 ft-lbs (10 Nm)

                   11. Fill the cooling system. Properly bleed both the
                      engine cooling system as well as the charge air
                      cooling system. See Cooling System Bleeding page
                      2.38.





                                                                         6. Install new thermostat into the housing.

                                                                                               CAUTION
                                                                           Installing the thermostat upside down will damage the
                                                                               thermostat and lead to engine overheating.












                   9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual                                           3.37
                   © Copyright Polaris Industries Inc.
   176   177   178   179   180   181   182   183   184   185   186