Page 227 - Manual_Polaris_RZR_ProXP-20-21
P. 227
ENGINE / COOLING SYSTEM
9. Install the Cylinder Holding & Camshaft Timing Plate 5. Install oil drain diverter e into the upper crankcase.
(PU-50563) r onto the cylinder. The cylinder holding
tool retains the cylinder and pistons when the engine
is rotated.
3
6. Apply Polaris PS-4 engine oil to each main and rod
bearing journal of crankshaft r.
CRANKSHAFT INSTALLATION
NOTICE
Whether installing a new crankshaft or re-installing the
original, refer to the bearing selection charts (see
Crankshaft Main Bearing Selection page 3.79 and
Connecting Rod Bearing Selection page 3.78.
1. Rotate the engine so the cylinder is facing down.
2. Clean the bearing bore surfaces of upper crankcase
(main bearings), connecting rods and connecting rod
caps.
3. Align tab of new main bearing q with the slot in main 7. Loop cam chain t and oil pump drive chain y over
bearing bore of crankcase. Press bearing insert firmly crankshaft sprockets.
into place. Repeat for all main bearings.
8. Apply Polaris PS-4 engine oil to the new crankshaft
4. Align tab of new connecting rod bearings w with the oil seal u and install the seal on the PTO end of the
slot in the connecting rod stem and connecting rod crankshaft.
end cap. Press bearing insert firmly into place.
Repeat for the other connecting rod.
9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual 3.83
© Copyright Polaris Industries Inc.