Page 238 - Manual_Polaris_RZR_ProXP-20-21
P. 238
ENGINE / COOLING SYSTEM
4. Carefully install the camshafts into the cylinder head. 8. Verify TDC mark on the flywheel is still properly
The PTO camshaft lobes t should face out. aligned (see Step 1).
9. Pull cam chain upward, making sure it is engaged
with the drive sprocket on the crankshaft.
10.While lifting the cam chain up, engage the cam
sprockets into the chain with the “I” and “E” marks
facing out.
11. Install the sprockets onto the camshafts and align the
sprocket marks with the valve cover gasket surface
(refer to Camshaft Timing Quick Reference page
3.97).
NOTICE
Intake cam sprocket should have “I” marks aligned
close to gasket surface and the exhaust cam sprocket
should have “E” marks aligned.
Install the exhaust cam sprocket first to ensure proper
5. Carefully install the rear camshaft carriers onto the
camshafts. Carriers should face each as shown. cam timing.
6. Install the four bolts that retain each rear camshaft
carrier y and tighten the bolts evenly until snug. 12.Use new camshaft sprocket retaining bolts upon
assembly. Install the top bolt i in each camshaft
sprocket u. Do not torque the bolts at this time.
7. Install the Cylinder Holding & Camshaft Timing Plate
(PU-50563) into the end of camshafts as shown. Use
an open-end wrench to rotate camshafts slightly. NOTICE
Use new sprocket retaining bolts upon assembly.
3.94 9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
© Copyright Polaris Industries Inc.