Page 236 - Manual_Polaris_RZR_ProXP-20-21
P. 236
ENGINE / COOLING SYSTEM
11. Install the valve tappet i for each valve in the order CYLINDER HEAD INSTALLATION
they were removed.
1. If necessary, rotate the engine so the cylinder is
NOTICE facing up.
Oil the tappet prior to installing. 2. If installed, remove the Cylinder Holding & Camshaft
If any valve train components were replaced, refer to Timing Plate q from the cylinder.
Valve Clearance Adjustment page 2.31.
VALVE SEALING TEST
1. Clean and dry the combustion chamber area q.
NOTICE
Once the cylinder head is removed, nothing retains the
cylinder to the engine. DO NOT rotate the engine
without using the Cylinder Holding & Camshaft Timing
Plate (PU-50563).
2. Pour a small amount of clean solvent into each intake 3. Prepare cylinder head gasket sealing surfaces by
port w and check for leakage around the valves. The cleaning thoroughly to remove all residue. The head
valve seats should hold fluid with no seepage. gasket must be installed clean and dry, free from oil
or grease.
3. Repeat for exhaust valves by pouring fluid into each
exhaust port e. NOTICE
Do not touch the gasket sealing surfaces.
4. Guide cam chain w through a new head gasket e
and install the gasket on the cylinder, locating it on
the alignment pins.
5. Carefully set the cylinder head r in place on
alignment pins.
3.92 9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
© Copyright Polaris Industries Inc.