Page 185 - Manual Oficina Polaris RZR XP 1000 17-18
P. 185
ENGINE / COOLING SYSTEM
5. Carefully install the rear camshaft carriers onto the 12. Use new camshaft sprocket retaining bolts upon
camshafts. Carrier openings should face each other assembly. Install the top bolt i in each camshaft
when installed properly. sprocket u. Do not torque the bolts at this time.
6. Install the four bolts that retain each rear camshaft
carrier y and tighten the bolts evenly until snug.
3
NOTICE
Use new sprocket retaining bolts upon assembly.
7. Install the Cylinder Holding & Camshaft Timing Plate
(PU-50563) into the end of camshafts as shown. Use
a 13/16” open-end wrench to rotate camshafts
slightly if needed.
8. Verify the TDC mark on the flywheel is still properly
aligned (see Step 1).
9. Pull cam chain upward, making sure it is engaged
with the drive sprocket on the crankshaft.
10. While lifting the cam chain up, engage the cam
sprockets into the chain with the “I” and “E” marks
facing out.
11. Install the sprockets onto the camshafts and align
the sprocket marks with the valve cover gasket
surface (see Chapter 3 – Camshaft Timing - Quick
Referencepage 3.80).
NOTICE
Intake cam sprocket should have “I” marks aligned with
gasket surface and the exhaust cam sprocket should
have “E” marks aligned with gasket surface.
Install the exhaust cam sprocket first (opposite the cam
chain tensioner) to ensure proper cam timing.
9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual 3.77
© Copyright Polaris Industries Inc.