Page 331 - Manual Oficina Polaris RZR XP 1000 17-18
P. 331

FINAL DRIVE

                   FRONT BEARING CARRIER INSTALLATION                    6. Install new brake caliper mounting bolts and torque
                   1. Install drive shaft axle through the backside of the   to specification.
                       bearing carrier.
                                                                                             TORQUE
                   2. Install the upper and lower ball joint ends into the           Front Caliper Mounting Bolts:
                       front bearing carrier.
                                                                                           30 ft-lb (41 Nm)
                   3. Install new pinch bolts q and nuts. Torque to
                       specification.
                                                                                             CAUTION
                                                                           New bolts have a pre-applied locking agent which is
                                                                          destroyed upon removal. Always use new brake caliper
                                                                                    mounting bolts upon assembly.

                                                                         7. Install the steering tie rod end r onto the front
                                                                             bearing carrier.

                                                                                               NOTE
                                                                          Refer to the photo below to ensure proper placement of
                                                                                           the tie rod end.






                                        TORQUE
                                   Ball Joint Pinch Bolts:
                                     42 ft-lbs (57 Nm)

                   4. Apply Anti-Seize to drive shaft axle splines.                                                           7

                   5. Install front wheel hub assembly w, cone washer(s)
                       e, and hand tighten the castle nut. Install washers
                       with domed side out.



                                                                         8. Torque the tie rod end fastener t to specification
                                                                             and install a new cotter pin t.
                                                                                             TORQUE
                                                                                        Tie Rod End Fastener:
                                                                                        15 ft-lbs (20 Nm) + 90°

























                   9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual                                        7.5
                   © Copyright Polaris Industries Inc.
   326   327   328   329   330   331   332   333   334   335   336