Page 216 - Manual Oficina Polaris RS1 2018 e 2019
P. 216

FUEL SYSTEM

                FUEL TANK INSTALLATION                                                    TORQUE

                1. Carefully reinstall the fuel tank assembly.                 Power Steering Unit Mounting Bolts:
                2. Reinstall the fuel tank strap and fuel tank fasteners.              30 ft-lb (41 Nm)

                                    TORQUE
                              Fuel Tank/Strap Screws
                                  8 ft-lbs (11 Nm)

                3. Install the fuel vent line and supply line.
                4. Install fuel pump electrical connector.
                5. Install main floor.
                                    CAUTION
                   Use caution when installing the main floor to avoid
                  damaging the master cylinder rod and/or assembly.

                6. Reinstall rear lower close-off panel onto the fuel tank.
                   Secure with plastic rivets and torque screws to
                   specification.
                                                                     12.Install the power steering unit into the vehicle and
                                    TORQUE                              align the skip-tooth spline on the power steering stub
                                                                        shaft with the opening in the lower steering shaft.
                              Close-off Panel Screws
                                  8 ft-lbs (11 Nm)

                7. Reinstall the seat base frame and torque fasteners to
                   specification.
                                    TORQUE
                          Seat Base Frame fasteners (front)
                                  14 ft-lb (19 Nm)
                          Seat Base Frame fasteners (rear)
                                  30 ft-lb (41 Nm)

                8. Install steering boot into the main floor.
                9. Install shift linkage onto the shift lever.
                10.Install two push darts and seven T40 torx screws into
                   the main floor. Torque screws to specification.   13.Place the power steering mount bracket over the top
                                                                        of the mounting studs and finger tighten the four nuts.
                                    TORQUE
                                                                     14.Position the lower steering shaft on the power
                              Main Floor Panel Screws                   steering unit stub shaft and install the pinch bolt.
                                  8 ft-lbs (11 Nm)                      Torque to specification.

                11. If the power steering unit q was removed from the
                   mount bracket w, reinstall it prior to vehicle
                   installation.  Torque  the  mounting  bolts e  to
                   specification


















                4.30                                                                      9928689 - 2018 RZR RS1 Service Manual
                                                                                                © Copyright Polaris Industries Inc.
   211   212   213   214   215   216   217   218   219   220   221