Page 277 - Manual Oficina Polaris RZR 570 13-18
P. 277
TRANSMISSION
12. Loosen the three clamps r securing the intake 15. Place a shop to beneath the fuel line quick connector
baffle assembly to the air box lid, inner clutch cover to catch any excess fuel. Disconnect the fuel line
and engine crankcase vent. Remove the air intake from the fuel rail by pressing in on the quick
baffle / intake hoses / engine crankcase vent tube an connector tabs. Move fuel line to the left-hand side of
assembly as shown below. the engine compartment. Make note of line routing
for installation.
13. Remove the outer clutch cover, drive belt, drive
clutch, driven clutch and inner clutch cover (see
Chapter 6 – PVT Disassembly, page 5.8). Make note 16. Disconnect the IAC valve (A), TPS (B), T-MAP
of hose and wire routing for reassembly.
sensor (C), harness leads from the throttle body. 6
CAUTION
Be sure to use the correct Drive Clutch Puller (PA-
48595) to prevent damage to crankshaft.
14. Loosen the hose clamp t that secures the air box to
the throttle body. Cut the tie strap y that secures the
wire harness to the right-hand side of the air box.
Remove the air box assembly.
17. Remove throttle body from the engine and wrap it
with a clean shop towel. Place throttle body on the
LH side frame rail area.
NOTE
Be sure dirt and debris do not enter the engine, air box
or throttle body. Use clean shop towels to plug engine
and air box intake holes.
9926813 R06 - 2013-2016 RZR 570 Service Manual 6.7
© Copyright Polaris Industries Inc.