Page 281 - Manual Oficina Polaris RZR 570 13-18
P. 281
TRANSMISSION
5. Install the Clutch Center Distance Tool onto the 6. Torque the rear transmission mount bolts to
crankshaft and transmission input shaft to properly specification.
position the clutch center distance. The pictures
below show the Clutch Center Distance Tool properly
installed.
7. In sequence, torque the eight engine coupler bracket
bolts to specification.
6
TORQUE
Clutch Center Distance Tool
PU-50658 Engine to Trans Coupler bolts:
(In Sequence)55 ft-lbs (75 Nm)
8. Remove the clutch center distance tool.
9. Remove the spacer or support between the vehicle
frame and engine.
10. Replace starter O-ring if needed and lubricate O-ring
with grease. Install the starter and the two bolts
securing the starter motor to the engine. Torque
fasteners to specification as outlined in Chapter 10.
Be sure wires are routed correctly.
TORQUE
Starter Mounting Bolts:
7 ft-lb (10 Nm)
9926813 R06 - 2013-2016 RZR 570 Service Manual 6.11
© Copyright Polaris Industries Inc.