Page 295 - Manual Oficina Polaris RZR 570 13-18
P. 295
TRANSMISSION
21. Assemble the shift shaft rail if previously 23. Inspect the shift drum for any damage or wear.
disassembled. Inspect the splines of the shift drum.
24. Install the shift drum (E) into the transmission
housing. Lift up on the shift shaft rail (D) and move
NOTE the rail assembly towards the shift drum to allow the
Both shift forks need to be orientated the same way, so shift fork ends to be installed into the shift drum (E).
that the shift fork pins are both offset to the same side
of the rail.
6
22. Install the shift shaft rail (D) and shift forks into the
transmission housing as an assembly. Be sure the
shift forks are engaged into the engagement dogs.
25. Apply a continuous bead of Crankcase 3 Bond
Sealant (PN 2871557) to the left hand transmission
mating surface.
NOTE
Shift fork pins should be offset towards the input shaft
as shown above.
9926813 R06 - 2013-2016 RZR 570 Service Manual 6.25
© Copyright Polaris Industries Inc.