Page 296 - Manual Oficina Polaris RZR 570 13-18
P. 296

TRANSMISSION


                26. Install the transmission case cover and retaining  28. Thoroughly clean the shift shaft housing. Be sure
                   Bolts. Torque Bolts to specification.                 the transmission is in High gear prior to
                                                                         reassembly.
























                                                                     29. Install the sector gear (16T) onto the shift drum shaft.
                                                                         Install the shift shaft assembly and sector gear (11T)
                                                                         into the bushing pocket on the left side. Align the
                                    TORQUE                               timing marks on the gears as shown.
                              Transmission Case Bolts:
                                 17 ft-lbs (23 Nm)


                27. Install new seals into the transmission case halves.
                • The snorkel shaft seal (F), should be pressed in until it
                  seats against the housing counter-bore.
                • The input shaft seal (G), should be pressed in until it
                  seats flush with the housing.
                • The rear output shaft seals (H), can be installed using
                  a standard bushing installation tool. Seals should be
                  installed just past the case lead-in chamfer (.070 in. or
                  1.8 mm from the outer face of the bore).


































                6.26                                                               9926813 R06 - 2013-2016 RZR 570 Service Manual
                                                                                               © Copyright Polaris Industries Inc.
   291   292   293   294   295   296   297   298   299   300   301