Page 296 - Manual Oficina Polaris RZR 570 13-18
P. 296
TRANSMISSION
26. Install the transmission case cover and retaining 28. Thoroughly clean the shift shaft housing. Be sure
Bolts. Torque Bolts to specification. the transmission is in High gear prior to
reassembly.
29. Install the sector gear (16T) onto the shift drum shaft.
Install the shift shaft assembly and sector gear (11T)
into the bushing pocket on the left side. Align the
TORQUE timing marks on the gears as shown.
Transmission Case Bolts:
17 ft-lbs (23 Nm)
27. Install new seals into the transmission case halves.
• The snorkel shaft seal (F), should be pressed in until it
seats against the housing counter-bore.
• The input shaft seal (G), should be pressed in until it
seats flush with the housing.
• The rear output shaft seals (H), can be installed using
a standard bushing installation tool. Seals should be
installed just past the case lead-in chamfer (.070 in. or
1.8 mm from the outer face of the bore).
6.26 9926813 R06 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.