Page 352 - Manual Oficina Polaris RZR XP 1000 17-18
P. 352

FINAL DRIVE

                FRONT PROP SHAFT INSTALLATION                        REAR PROP SHAFT INSTALLATION
                1. Reverse   the   appropriate  Front  Prop  Shaft   1. Reverse the appropriate “Rear Prop Shaft Removal”
                   Removalpage 7.21 procedure to reinstall the front     procedure to reinstall the rear prop shaft.
                   propshaft.
                                                                     2. Lubricate the transmission output shaft splines with
                2. Lubricate front gearcase shaft splines with Anti-     Polaris All Purpose Grease.
                   Seize.
                                                                     3. Lubricate the front and rear prop shaft mid joint with
                3. Lubricate the front and rear prop shaft mid joint with  Polaris All Purpose Grease.
                   Polaris All Purpose Grease.
                                                                     4. Slide the rear prop shaft forward from the left rear of
                4. Align the front and rear prop shafts as shown below   the machine just below the PVT cover. Install the rear
                   and slide them together.                              prop shaft on the transmission snorkel shaft.
                                                                     5. Lubricate the support bushing with light oil to ease
                                                                         installation and install the bushing on the rear prop
                                                                         shaft bearing.
                                                                     6. Align the front and rear prop shafts as shown below
                                                                         and slide them together.



































                                      NOTE
                Paint marks are applied to the front and rear prop shafts
                  to aid shaft alignment. Reference these marks during
                              installation if still visible.

                5. When installing the front prop shaft onto the front
                   gearcase, use a new roll pin.                                           NOTE
                                                                      Paint marks are applied to the front and rear prop shafts
                6. Reposition the front gearcase and install the four
                   bolts that secure the front gearcase to the frame.  to aid shaft alignment. Reference these marks during
                   Torque bolts to specification.                                   installation if still visible.

                                    TORQUE
                           Front Gearcase Mounting Bolts:
                                 35 ft-lbs (47 Nm)




                7.26                                                   9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual
                                                                                                © Copyright Polaris Industries Inc.
   347   348   349   350   351   352   353   354   355   356   357