Page 352 - Manual Oficina Polaris RZR XP 1000 17-18
P. 352
FINAL DRIVE
FRONT PROP SHAFT INSTALLATION REAR PROP SHAFT INSTALLATION
1. Reverse the appropriate Front Prop Shaft 1. Reverse the appropriate “Rear Prop Shaft Removal”
Removalpage 7.21 procedure to reinstall the front procedure to reinstall the rear prop shaft.
propshaft.
2. Lubricate the transmission output shaft splines with
2. Lubricate front gearcase shaft splines with Anti- Polaris All Purpose Grease.
Seize.
3. Lubricate the front and rear prop shaft mid joint with
3. Lubricate the front and rear prop shaft mid joint with Polaris All Purpose Grease.
Polaris All Purpose Grease.
4. Slide the rear prop shaft forward from the left rear of
4. Align the front and rear prop shafts as shown below the machine just below the PVT cover. Install the rear
and slide them together. prop shaft on the transmission snorkel shaft.
5. Lubricate the support bushing with light oil to ease
installation and install the bushing on the rear prop
shaft bearing.
6. Align the front and rear prop shafts as shown below
and slide them together.
NOTE
Paint marks are applied to the front and rear prop shafts
to aid shaft alignment. Reference these marks during
installation if still visible.
5. When installing the front prop shaft onto the front
gearcase, use a new roll pin. NOTE
Paint marks are applied to the front and rear prop shafts
6. Reposition the front gearcase and install the four
bolts that secure the front gearcase to the frame. to aid shaft alignment. Reference these marks during
Torque bolts to specification. installation if still visible.
TORQUE
Front Gearcase Mounting Bolts:
35 ft-lbs (47 Nm)
7.26 9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual
© Copyright Polaris Industries Inc.