Page 125 - Manual Oficina Polaris RS1 2018 e 2019
P. 125

ENGINE / COOLING SYSTEM


                   5. Install the starter positive cable and 10mm nut. Install               TORQUE
                      two hinge clips as shown.
                                                                                     Shift cable bracket fasteners:
                                                                                           37 ft-lb (50 Nm)

                                                                         10.While reaching thought the access cover, plug in two
                                                                            spark plug wires.




                                                                                                                              3








                   6. Reconnect crank position sensor connection and
                      stator wire connection on right hand side of engine.
                   7. Install transmission vent line q.


                                                                         11. Reinstall engine access cover and fastener e.

















                   8. Reconnect the transmission/shift cable to the linkage
                      and secure with circlip and hinge clip.
                   9. Install two 15mm transmission shift cable bracket
                      fasteners w. Torque to specification.              12.Connect coolant temperature sensor connector.





























                   9928689 - 2018 RZR RS1 Service Manual                                                              3.39
                   © Copyright Polaris Industries Inc.
   120   121   122   123   124   125   126   127   128   129   130