Page 242 - Manual Oficina Polaris RZR 570 13-18
P. 242
PVT SYSTEM
10. Clean the end of the taper on the crankshaft and the
tapered bore inside the drive clutch.
11. Install drive clutch onto the engine and torque
retaining bolt to specification.
TORQUE
Drive Clutch Retaining Bolt:
47 ft-lbs (64 Nm)
12. Install the drive belt noting direction of belt rotation
(see Chapter 6 – Belt Installation, page 5.12). If a
new belt is installed, install so numbers can be easily
read.
13. Install a new outer clutch cover seal with the colored
stripe facing the inner clutch cover.
14. Reinstall outer clutch cover and secure with bolts.
Torque bolts to specification.
TORQUE
PVT Outer Clutch Cover bolts:
50 in-lbs (5 Nm)
15. Install the clutch inlet and outlet ducts and tighten the
hose clamps.
TORQUE
Wheel Nuts:
RZR 570 Steel Rims: 36 ft-lbs (49 Nm)
RZR 570 EPS Alum. Rims: 120 ft-lb (163 Nm)
RZR S 570 Alum. Rims: 30 ft-lbs (41 Nm) + 90°
16. Reconnect the battery cable.
17. Install engine service panel and both seats.
5.10 9926813 R06 - 2013-2016 RZR 570 Service Manual
© Copyright Polaris Industries Inc.