Page 376 - Manual Oficina Polaris RZR 570 13-18
P. 376

STEERING / SUSPENSION


                5. Install Spacer w over the top of the ball joint face.  BALL JOINT INSTALLATION
                                                                     1. By hand, install the NEW ball joint into the A-arm.

                                                                     2. Position the Installation Adapter t over the face of
                                                                         the ball joint.
















                6. Place Removal Adaptor e over the ball joint shaft.
                7. Install the Press Asm. r onto the A-arm to engage
                   the ball joint Removal Adapter.
                                                                     3. Position the Spacer w over the shaft of the ball joint
                                     NOTE
                                                                         so it is against the A-arm.
                 Be sure the Press Asm. opening is only contacting the
                          Spacer and not the ball joint face.        4. Install the Press Asm. r onto the A-arm to engage
                                                                         the Installation Adapter and Spacer.
                8. Tighten the Press Asm. screw and fully remove the  5. Tighten the Press Asm. screw and fully install the
                   ball joint from the A-arm.                            ball joint into the arm.
                                                                     6. After the new ball joint is fully installed into the A-
                                                                         arm, install a new retaining ring q.





















                                                                     7. Repeat the ball joint service procedure for any
                                                                         additional A-arm ball joint replacements.
                                                                     8. Insert upper / lower A-arm ball joint end into the
                                                                         bearing carrier. Install new pinch bolts and nuts.
                                                                         Torque to specification.

                                                                                         TORQUE
                                                                                  Front Ball Joint Pinch Bolts:
                                                                                       23 ft-lb (31 Nm)









                8.16                                                               9926813 R06 - 2013-2016 RZR 570 Service Manual
                                                                                               © Copyright Polaris Industries Inc.