Page 372 - Manual_Polaris_RZR_ProXP-20-21
P. 372

FINAL DRIVE


                6. Using a commercially available two-jaw puller rated to  REAR DRIVE SHAFT INSTALLATION
                   a minimum of 3 tons, press the drive shaft out of the
                   hub/bearing carrier assembly.                     1. Install new spring ring q on drive shaft. Apply an
                                                                        anti-seize compound to the splines w.





















                                     NOTICE
                                                                                         IMPORTANT
                           Hub not shown for image clarity.
                                                                       Apply anti-seize to the transmission-side splines only.
                                                                          Do not apply anti-seize to the hub-side splines.

                                      CAUTION
                                                                     2. Align splines of drive shaft with transmission splines
                  Do NOT use a puller on the brake rotor to remove the
                                    drive shaft.                        and reinstall the drive shaft. Use a rubber mallet to
                                                                        tap on the outboard end of the drive shaft if
                   Do NOT use heat to remove drive shaft from hub.
                                                                        necessary.
                                                                     3. Clean drive shaft splines and hub assembly splines
                7. With a short, sharp jerk, remove drive shaft from the  thoroughly with contact cleaner and wire brush.
                   transmission splines.                                Remove all/any Loctite® residue.
                                                                                         IMPORTANT
                                                                        Removal of all Loctite® material is a labor intensive
                                                                         process and may take up to 10 minutes or more to
                                                                      complete. It is critical that these surfaces are clean and
                                                                        no residual Loctite® material or corrosion is present.

                                                                     4. Apply Loctite® Primer 7649 to the hub assembly
                                                                        splines. Allow 90 seconds for the primer to dry.



























                8.14                                                       9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
                                                                                                © Copyright Polaris Industries Inc.
   367   368   369   370   371   372   373   374   375   376   377