Page 367 - Manual_Polaris_RZR_ProXP-20-21
P. 367

FINAL DRIVE

                   REAR BEARING CARRIER                                  3. Clean drive shaft splines and hub assembly splines
                   INSTALLATION                                             thoroughly with contact cleaner and a wire brush.
                                                                            Remove all/any Loctite® residue.
                   1. Install drive shaft through the backside of the bearing
                      carrier.                                                              IMPORTANT
                                                                            Removal of all Loctite® material is a labor intensive
                                                                            process and may take up to 10 minutes or more to
                                                                          complete. It is critical that these surfaces are clean and
                                                                           no residual Loctite® material or corrosion is present.


                                                                         4. Apply Loctite® Primer 7649 to the hub assembly
                                                                            splines. Allow 90 seconds for the primer to dry.
                                                                         5. Apply Loctite® 680 to the hub-side splines of the
                                                                            drive shaft. Apply Loctite® 680 around the entire
                                                                            circumference of the end of the hub-side splines, and
                                                                            then apply Loctite® 680 in a spiral pattern as shown.





                   2. Install the four fasteners q that attach the rear
                      bearing carrier to the trailing arm. Install the one
                      fastener w that attaches the upper radius rod to the
                      bearing carrier. Torque bolts to specification.
                                         NOTICE
                       Use new nuts upon installation of the rear bearing
                                         carrier.






                                                                                               CAUTION                        8
                                                                          Use caution to avoid getting Loctite® on the drive shaft
                                                                                         threads or castle nut.


                                                                         6. Install rear wheel hub assembly e, cone washer r,
                                                                            and hand tighten the castle nut. Install washers with
                                                                            domed side out.





                                        TORQUE
                            Bearing Carrier to Trailing Arm Bolts:
                                     44 ft-lbs (60 Nm)

                                Outer Radius Rod Fastener:
                                  52 ft-lbs (70 Nm) + 90°












                   9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual                                             8.9
                   © Copyright Polaris Industries Inc.
   362   363   364   365   366   367   368   369   370   371   372