Page 119 - Manual Oficina Polaris RS1 2018 e 2019
P. 119
ENGINE / COOLING SYSTEM
19.Remove hub assembly. 23.Remove two fasteners u securing the shock to the
frame.
3
20.While pulling the trailing arm away from the vehicle
push the CV shaft towards the vehicle until it is clear NOTE
of the bearing carrier. Once it is clear of the bearing
carrier move it towards the rear of the vehicle. Take care when storing shock to not damage threads
on shock body.
24.Remove PVT intake duct i .
21.Remove the CV shaft from the transmission by
quickly pulling the CV shaft away from the vehicle.
22.Remove the shock remote reservoir by loosening the
worm clamps and cable tie. 25.Remove nine PVTcover fasteners o and cover.
26.Remove drive belt by inserting tool PN 2875911 into
the driven clutch.
9928689 - 2018 RZR RS1 Service Manual 3.33
© Copyright Polaris Industries Inc.

