Page 251 - Manual Oficina Polaris RZR 570 13-18
P. 251

PVT SYSTEM


                                         NOTE                            ROLLER, PIN, AND THRUST WASHER
                                                                         INSPECTION
                     It is important that the same number and thickness of
                       washers are reinstalled beneath the spider during  Inspect all rollers, bushings and roller pins by pulling a
                    assembly. Be sure to note the number and thickness of  flat metal rod across the roller. Turn roller with your
                                      these washers.                     finger. If you notice resistance, galling, or flat spots,
                                                                         replace rollers, pins and thrust washers in sets of three.
                                                                         Also inspect to see if roller and bushing are separating.
                                                                         Bushing must fit tightly in roller. Use the Roller Pin Tool
                                                                         e to replace rollers and pins. Take care not to damage
                                                                         roller bushing or bearing surface of the new pin during
                                                                         installation.

                                                                                                   2870910
                                                                                                 Roller Pin Tool




                                                                             e
                                                                                                                              5

                   2. Inspect the Teflon™ coating on the moveable sheave
                      bushing.



                                                                         BUTTON TO TOWER CLEARANCE
                                                                         INSPECTION

                                                                         1. Inspect for any clearance between spider button to
                                                                            tower. If clearance exists, replace all buttons and
                                                                            inspect surface of towers.










                          Moveable Sheave Bushing Inspection:
                     Replace the cover bushing if more brass than Teflon is
                    visible on the bushing. Refer to bushing replacement in
                                       this chapter.







                                                                                      Button to Tower Clearance:
                                                                                             .000-.012”













                   9926813 R06 - 2013-2016 RZR 570 Service Manual                                                     5.19
                   © Copyright Polaris Industries Inc.
   246   247   248   249   250   251   252   253   254   255   256