Page 347 - Manual_Polaris_RZR_ProXP-20-21
P. 347

TRANSMISSION


                   8. Install the primary clutch, belt and secondary clutch.  12.Install zip ties retaining fuel lines and harnesses to
                      Install snap ring on transmission input shaft before  intake manifold.
                      installing secondary clutch mounting bolt. Torque
                      fasteners to specification.
                                        TORQUE
                                    Primary Clutch Bolt:
                                    140 ft-lbs (190 Nm)

                                  Secondary Clutch Bolt:
                                     43 ft-lbs (58 Nm)


                   9. Install PVT hoses and outer PVTcover. Torque
                      fasteners to specification.
                                        TORQUE
                                      Hose Clamps:
                                      35 in-lb (4 Nm)                    13.Connect harness going to TBAP, both TMAP sensors,
                                                                            CPS, coolant temp sensor, Trans switch, speed
                                Outer PVT Cover Fasteners:                  sensor, injectors, ETC.
                                      35 in-lb (3 Nm)                    14.Connect the fuel line at the fuel rail.

                                                                         15.Connect the valve cover vent line.
                   10.Connect the starter wiring. Torque fasteners to
                      specification.                                     16.Connect stator harness.
                                                                         17.Install the coolant hose to the thermostat housing and
                                        TORQUE
                                                                            the water pump hose.
                                    Starter Cable Nuts:
                                                                         18.Install the two hoses going to charge air cooler.
                                      30 in-lb (3 Nm)                                                                         7
                                                                         19.Install air box and engine air intake. Torque fasteners
                                                                            to specification.
                   11. Install throttle body / intake manifold assembly.
                      Tighten clamps retaining intake manifold to engine.                     TORQUE
                      Install lower manifold mounting bolt (to trans mount            Air Box Mounting Fasteners:
                      bracket). Torque fasteners to specification.
                                                                                            8 ft-lb (11 Nm)
                                        TORQUE
                                                                                           Intake Clamps:
                                  Intake Manifold Clamps:
                                                                                           49 in-lb (6 Nm)
                                      6 ft-lb (8 Nm)
                         Lower Intake Manifold Mounting Fasteners:       20.Install head pipe/turbo assembly. See Head Pipe /
                                     20 ft-lb (27 Nm)                       Turbo Installation page 3.19.
                                                                         21.Install rear fenders/fender flares. Torque fasteners to
                                                                            specification.
                                                                                              TORQUE
                                                                                  Rear Fender/Fender Flare Fasteners:
                                                                                           7 ft-lbs (10 Nm)

                                                                         22.Install cargo box. Torque fasteners to specification.

                                                                                              TORQUE
                                                                                        Cargo Box Fasteners:
                                                                                           7 ft-lbs (10 Nm)






                   9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual                                             7.9
                   © Copyright Polaris Industries Inc.
   342   343   344   345   346   347   348   349   350   351   352