Page 138 - Manual Oficina Polaris RZR XP 1000 17-18
P. 138
ENGINE / COOLING SYSTEM
29.Install the air box assembly as outlined in the EFI 34.Connect the (-) negative battery cable.
Chapter (See Chapter 4 – ETC Replacementpage
4.42). 35.Remove the pressure cap and fill the cooling system
through the filler neck with properly mixed anti-freeze
30.Install the inner clutch cover, drive clutch, driven / coolant.
clutch, drive belt, outer clutch cover and clutch outlet
duct (see Chapter 6 – PVT Assemblypage 5.11). 36.Install a new oil filter. Lubricate the seal with engine
oil prior to installation (see Chapter 2 – Engine Oil
31.Install the left rear shock lower mounting bolt and new and Filter Changepage 2.31).
nut. Torque to specification.
37.Add approximately 2.5 quarts (3.3 L) of Polaris PS-4
TORQUE or PS-4 Extreme Duty Synthetic Engine Oil to the
engine. Additional oil may be required after complete
Rear Shock Mounting Bolt: engine disassembly. Check level after filling and add
70 ft-lbs (95 Nm) oil as needed.
38.Follow the Cooling System Bleeding Procedurepage
32.Install the left rear wheel and torque wheel nuts to 3.15 as outlined in this chapter.
specification.
39.Install the seats.
TORQUE 40.Start engine and check for any oil or coolant leaks.
Wheel Nuts: 41.Turn the key OFF and check the engine oil level.
120 ft-lbs (163 Nm)
42.Refer customer to “Engine Break-In Period” upon
returning vehicle to customer.
33.Install the rear bumper and cargo box as an
assembly.
NOTE
Be sure to connect the engine intake hose and clutch
air intake hose to the rear cargo box asm upon
installation.
ENGINE MOUNTING AND TORQUE VALUES
3.30 9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual
© Copyright Polaris Industries Inc.