Page 285 - Manual Oficina Polaris RZR XP 1000 17-18
P. 285
PVT SYSTEM
8. Tighten the spider jam nut using Clutch Spider Nut 11. Install the drive clutch cover h. Be sure all marks are
Socket d. Torque jam nut to specification. in alignment.
Clutch Spider Nut Socket: PU-50578
TORQUE
Spider Jam Nut:
250 ft-lb (339 Nm)(Apply 0.1 mL Loctite® 7088
Primer and 0.1 mL Loctite® 620™) in 90° apart to the
threads of the spider jam nut.
9. After the spider and jamb nut have been torqued,
remove the clutch assembly from the holding fixture
and inspect the alignment marks made during
disassembly.
NOTICE 12. Install cover bolts j and torque in a cross pattern
If the marks illustrated below are not in alignment upon evenly to specification.
assembly, the clutch will not be in balance and the drive 5
clutch assembly must be replaced. TORQUE
Drive Clutch Cover Bolts:
9 ft-lb (12 Nm)
10. Install the limiter spacer f and the clutch spring g.
CAUTION
DO NOT reassemble the drive clutch without the limiter
spacer. Belt life will be greatly reduced.
9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual 5.25
© Copyright Polaris Industries Inc.