Page 307 - Manual Oficina Polaris RZR XP 1000 17-18
P. 307
TRANSMISSION
27.If transmission lubricant was drained, fill the TRANSMISSION DISASSEMBLY
transmission with the specified amount of Polaris
AGL (see Chapter 2 – Transmission Lubricationpage NOTICE
2.49).
Refer to the exploded view at the end of this chapter as
a reference.
FLUID CAPACITY
Recommended Transmission Lubricant:
AGL 1. Place transmission in High gear before disassembly.
2. Drain and properly dispose of the transmission
Capacity (Standard): lubricant (see Chapter 2).
44 oz (1300 mL)
3. Remove the bell crank nut q and bell crank w.
Capacity (INT’L):
40.5 oz (1200 mL)
TRANSMISSION VENT LINE ROUTING
The transmission vent line connects to a nipple q on the
side of the transmission near the transmission switch.
The vent line routes up through the gap between the
MAG and PTO intake runners and is retained by a clip w
mounted to the cargo box rear bracket.
6
4. Remove E-clip e that retains spring and flat washers
r and gear switch t. Remove the switch.
5. Remove the sector cover bolts y and remove the
sector cover u.
NOTICE
Removal can be aided by using your thumbs to press in
on the shafts while pulling out the cover with your
fingers.
The line runs parallel with the fuel supply line and is 6. Remove the compression spring i.
retained by a zip tie e attached to the cargo box front
bracket. The line terminates to open air (does not
terminate to a fitting or hole in the frame).
9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual 6.15
© Copyright Polaris Industries Inc.