Page 192 - Manual_Polaris_RZR_ProXP-20-21
P. 192

ENGINE / COOLING SYSTEM


                24.Disconnect the fuel line g at the fuel rail.      29.Remove PVT hoses and outer cover.





















                25.Disconnect vent line h from the valve cover.      30.Remove secondary clutch, belt, and primary clutch.
                                                                     31.Remove six fasteners l and remove the inner PVT
                                                                        cover baffle.


















                26.Loosen and remove clamps j retaining intake
                   manifold to engine. Remove lower manifold mounting
                   bolt k (to trans mount bracket).
                                                                     32.Support the bottom side of the engine with wood
                                                                        blocks or from the top side with an engine lift.
                                                                     33.Remove the three allen screws 1( and washers 2)
                                                                        retaining inner cover to engine.

















                27.Remove intake manifold and throttle body as
                   assembly.
                28.Disconnect the starter wiring.







                3.48                                                       9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual
                                                                                                © Copyright Polaris Industries Inc.
   187   188   189   190   191   192   193   194   195   196   197