Page 191 - Manual_Polaris_RZR_ProXP-20-21
P. 191
ENGINE / COOLING SYSTEM
16.Remove two fasteners o and remove the lower turbo 19.Remove two hoses going to the charge air cooler and
heat shield. There is a third fastener in the center of move the hoses towards the front of the vehicle.
the turbo housing.
3
20.Remove thermostat housing hose s and water pump
17.Remove six fasteners a retaining the head pipe to hose d.
the cylinder head.
21.Disconnect stator harness and disconnect the
18.Slide the head pipe off the studs and remove the harness retainer from the engine mount.
head pipe/turbo from the vehicle. 22.Disconnect TBAP, both TMAP sensors, CPS, coolant
temp sensor, Trans switch, speed sensor, injectors,
CAUTION ETC.
Do not handle the turbo/head pipe assembly by the 23.Remove zip ties retaining electrical harnesses and
actuator rod. The rod will become damaged and the transmission vent line to intake manifold f.
turbo will not function properly.
9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual 3.47
© Copyright Polaris Industries Inc.