Page 191 - Manual_Polaris_RZR_ProXP-20-21
P. 191

ENGINE / COOLING SYSTEM


                   16.Remove two fasteners o and remove the lower turbo  19.Remove two hoses going to the charge air cooler and
                      heat shield. There is a third fastener in the center of  move the hoses towards the front of the vehicle.
                      the turbo housing.










                                                                                                                              3









                                                                         20.Remove thermostat housing hose s and water pump
                   17.Remove six fasteners a retaining the head pipe to     hose d.
                      the cylinder head.




















                                                                         21.Disconnect stator harness and disconnect the
                   18.Slide the head pipe off the studs and remove the      harness retainer from the engine mount.
                      head pipe/turbo from the vehicle.                  22.Disconnect TBAP, both TMAP sensors, CPS, coolant
                                                                            temp sensor, Trans switch, speed sensor, injectors,
                                         CAUTION                            ETC.
                      Do not handle the turbo/head pipe assembly by the  23.Remove zip ties retaining electrical harnesses and
                      actuator rod. The rod will become damaged and the     transmission vent line to intake manifold f.
                               turbo will not function properly.






















                   9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual                                           3.47
                   © Copyright Polaris Industries Inc.
   186   187   188   189   190   191   192   193   194   195   196