Page 363 - Manual_Polaris_RZR_ProXP-20-21
P. 363
FINAL DRIVE
FRONT BEARING CARRIER 6. Install new brake caliper mounting bolts and torque to
INSTALLATION specification.
1. Install drive shaft axle through the backside of the TORQUE
bearing carrier. Front Caliper Mounting Bolts:
2. Install the upper and lower ball joint ends into the 33 ft-lbs (45 Nm)
front bearing carrier.
3. Install pinch bolts q and nuts. Torque to specification.
CAUTION
New bolts have a pre-applied locking agent which is
destroyed upon removal. Always use new brake caliper
mounting bolts upon assembly.
7. Install the steering tie rod end r onto the front
bearing carrier.
TORQUE
Ball Joint Pinch Bolts:
44 ft-lbs (60 Nm)
4. Apply Anti-Seize to drive shaft axle splines.
5. Install front wheel hub assembly w, cone washer e,
and hand tighten the castle nut. Install washers with 8. Torque the tie rod end fastener t to specification.
domed side out. 8
TORQUE
Tie Rod End Fastener:
30 ft-lbs (40 Nm) + 90°
9930583 R01 - 2020-2021 RZR PRO XP / XP 4 Service Manual 8.5
© Copyright Polaris Industries Inc.