Page 338 - Manual Oficina Polaris RZR XP 1000 17-18
P. 338
FINAL DRIVE
FRONT DRIVE SHAFT INSTALLATION 5. Install new pinch bolts and nuts e. Torque to
1. Install new spring ring q on drive shaft. Apply an specification.
anti-seize compound to the splines w.
TORQUE
2. Align splines of drive shaft with front gearcase and
reinstall the drive shaft. Use a rubber mallet to tap on Ball Joint Pinch Bolts:
the outboard end of the drive shaft if necessary 42 ft-lbs (57 Nm)
6. Apply Anti-Seize to drive shaft axle splines.
7. Install front wheel hub assembly r, cone washer(s)
t, and hand tighten the castle nut. Install washers
with domed side out.
3. Install drive shaft into the front bearing carrier.
4. Install the upper and lower ball joint ends into the
front bearing carrier.
7.12 9928492 R06 - 2017-2018 RZR XP 1000 / XP4 1000 Service Manual
© Copyright Polaris Industries Inc.